NORAC UC4+BC+JD7 User Manual
Page 29
27
Figure 31: Cable Configurations: C10, C1 and C4
2. Connect the UC4+ power cable (C10)
and sensor trunk cable (C01) to the
UC4+ Control Panel (E01) (Figure
31).
Ensure the UC4+ Control Panel’s
power is OFF for the remaining
installation. (Bottom of switch
pressed IN).
3. Plug the 3-pin connector on C10 into
the cab’s power bar.
4. Route the free ends of C10 and C01
along the side of the cab post and under
the floor mat.
Figure 32: Hole under Floor Mat
5. Plug in the 6-pin Tower on C10 to the
6-pin Shroud on the valve extension
cable (C04) (Figure 31).
C04 comes with one connector
(M16) unassembled to allow the
cable to be run through a hole in
the floor under the steering
column. To assemble this
connector (M16), refer to the
drawing in Section 5.5. The pins
require a special tool to remove
them if you make an error.
The cables may also be routed
through the rear window of the
cab.
6. Route the free ends of C01 and C04 to
the rear of the sprayer near the sprayer
valve block. Run the cables along the
sprayer frame with the JD harness.
The hole in the floor may be
covered by a plate, or a grommet
may be installed in the hole. They
can be reinstalled after the wiring
is complete. NORAC supplies a
grommet (M13) for the hole if
one does not exist.