beautypg.com

NORAC UC4+BC+HD7 User Manual

Page 31

background image

28

16. Route the CAN Node cable (C02B) to

the roll sensors which are installed in
Section 4.5. Follow existing cables
and/or hydraulic lines.

17. Connect the 4-pin AMP connectors to

the roll sensors.

18. Connect the sensor branch cable (C02)

to the 4-pin AMP plug on C02B

(Figure 33).

19. Route the sensor branch cable (C02) to

the wing and main sensors and connect
to the sensors. Follow existing cables
and/or hydraulic lines along the boom.

20. Cable-tie the installed cables every 12

inches.

IMPORTANT:

Provide enough slack in all cables to
account for the movement of the

main section, parallel lift, and
FOLDING boom movement.

Figure 33: Cable Configurations: C11, C02 and C02B