beautypg.com

2 single acting plumbing – NORAC UC4+BC+HD7 User Manual

Page 27

background image

24

4.6.3.2 Single Acting Plumbing
1. After the NORAC valve is mounted, the

hydraulic hoses and fittings can be

plumbed. The plumbing for the hydraulic
circuit is shown schematically in Figure
4
.

2. Install the 90 degree fittings on hoses

H02 onto the “B” ports on the NORAC
valve block.

3. Route the free ends of the hoses to

each of the wing tilt cylinders.

4. Remove the Hardi hoses from the

“raise” line (the “B” line) of the cylinder
and remove the restricted straight BSPP
fittings. (Figure 28)

5. Install the 4FBSPPX 6MJ fittings (F04)

onto hoses H02. Install NORAC and
Hardi hoses onto the 4MBSPPT

4FBSPPRX tee (F05).

6. At the Hardi main valve block, remove

the hydraulic hoses that run from the
“raise” line of the tilt cylinders to the
valve block (Figure 27). Remove the
fittings from between the hoses and
valve block.


7. Install the restrictor that was removed

from the wing tilt cylinder between the
hoses and the valve block.

8. Install the fittings that were removed

from the valve block between the
cylinders and tee fittings (F05).

9. Remove the pressure and tank hoses

from the Hardi valve block and install
the 4MBSPPT 4FBSPPRX tee (F05)
between the valve block and hoses.
Install the 4FBSPPX 6MJ fittings (F04)
onto hoses H01.

10. Connect hoses H01 to each of the tee

fittings and route to the NORAC valve
block.

11. Install the corresponding hose to the

pressure and tank port on the NORAC
valve block.

Figure 28: Restrictor to be Replaced on the Tilt Cylinders

Eagle Boom

Force Boom

Replace this

Restrictor