24

Figure 28: Valve Cable Connections

17. Connect the CAN Node cable (C02B)

to the 4-pin AMP plug on C11 (Figure
29
).

18. Route the CAN Node cable (C02B) to

the roll sensors which are installed in
Section 4.5. Follow existing cables
and/or hydraulic lines.

19. Connect the 4-pin AMP connectors to

the roll sensors.

20. Connect the sensor branch cable (C02)

to the 4-pin AMP plug on C02B
(Figure 29).

21. Route the sensor branch cable (C02) to

the wing and main sensors and connect

to the sensors. Follow existing cables
and/or hydraulic lines along the boom.

22. Cable-tie the installed cables every 12

inches.

IMPORTANT:

Provide enough slack in all cables to
account for the movement of the

main section, parallel lift, and
FOLDING boom movement.

Figure 29: Cable Configurations: C11,

C02 and C02B