9 Software Setup

1. Test the functionality of the original manufacturer’s boom controls. The NORAC Control

Panel (E01) does not need to be powered up for the original switches to function. Unfold
the booms and raise/lower each boom and main section.

Confirm that the cabling and hoses are agreeable to the entire range of motion.

2. If any functions do not work, review the hydraulic and electrical portions of this manual to

check for proper installation.

3. Turn on the power for the UC4.5 Control Panel using the switch on the side of its chassis.

4. The procedure for the installation of the UC4.5 Spray Height Control system is now

complete. Begin the AUTOMATIC SYSTEM SETUP procedure as described in the UC4.5

Spray Height Control Operator’s Manual (M01).