beautypg.com

NORAC UC4.5-BC-SS1 User Manual

Page 24

background image



21

Figure 22: Tilt Accumulator Locations

7. Insert the 8MB 8MJ – 1/32 orifice fittings (F05) into each accumulator. Attach two of the

8FJXR 8MJT fittings (F06) in line on each accumulator as shown in Figure 23.

Figure 23: Accumulator Hydraulic Fittings

8. Attach the 90° ends of hoses H02 to the tees installed on the accumulators. Route hoses

H02 to the NORAC valve block.

9. Connect hoses H02 to the “B” ports on the NORAC valve block.

10. Connect the original hoses from the sprayer valve block and the wing cylinders to the tees

installed on the accumulators.

11. Tighten all fittings before restarting the machine and attempting to run hydraulic functions.

Right Tilt

Accumulator

Left Tilt Accumulator