3 both installations – NORAC UC4.5-BC-NT4 User Manual

Page 22

background image



19

7.3

Both Installations

1. Connect R12/R6 on C14 to P12/P6 on C10.

2. Route the four metri-pack connectors on C14 to the rear of the sprayer, in the vicinity of

the main lift valve block.

3. Disconnect the sprayer’s metri-pack tower labeled MM13 and connect it to the shroud

from C14 labeled “MAIN UP”. Connect the tower on C14 labeled “MAIN UP” to the
sprayer solenoid that was disconnected.

4. Disconnect the sprayer’s metri-pack connector labeled MM14 and connect it to the shroud

on C14 labeled “MAIN DOWN”. Connect the tower on C14 labeled “MAIN DOWN” to
the sprayer solenoid that was disconnected.

Figure 21: Nitro Main Section Valve Connector

Figure 22: Main Lift Wiring Connections

Main Lift Connectors

MM13

and MM14