beautypg.com

NORAC UC4.5-BC-JD8 User Manual

Page 21

background image



19

Figure 21: Load Sense Jam Valve Connector

9. Connect the 6-pin tower on the valve cable (C03) to the 6-pin shroud on C11.

10. Connect the 2-pin connectors on C03 to the NORAC valve block, as shown in Figure 22.

11. The connectors on the valve cable (C03) are marked RIGHT UP, LEFT UP, RIGHT

DOWN and LEFT DOWN. Cables labeled with UP go on the same side as the
hydraulic hoses.

Figure 22: Valve Cable Connections

12. Fasten the 8-way coupler to the boom with cable ties. Connect P6 on C11 to the 8-way

coupler.

13. Connect both roll sensors to the 8-way coupler.

14. Connect two cables (C05) to the 8-way coupler and route along the booms to the wing

sensors. Follow existing cables and hoses to be sure the cable will not be pinched or
stretched.

Connector

Location

Connector