7 electrical installation – NORAC UC4.5-BC-JD8 User Manual
Page 19
17
7 Electrical Installation
1. Install the UC4.5 Control Panel (E01) in the cab of the sprayer. Mount the panel where it
will be clearly visible and within easy reach of the operator.
A good spot to mount the UC4.5 control panel is on the right hand side of the cab to the
Roll Over Protection Bar. Four pilot holes for the screws provided need to be drilled to
facilitate the control panel mounting.
If desired, a mounting bracket (part #A53255) can be purchased from your local John Deere
dealer to allow the UC4.5 control panel to be mounted to the existing John Deere terminal
mount. Another option is to purchase an adapter for the flexible panel mount that has a
3/8" NC threaded stud on the end to bolt through the existing JD mount. These are
available at your local outdoor store as a RAM mount part number RAM-B-236. (See
http://www.ram-mount.com/
)
Figure 17: Cable Configurations: C10, C11 and C30
2. Connect the UC4.5 power cable (C10) to the UC4.5 Control Panel in the cab. Ensure that
both plugs (P16 and P4) are connected to the panel. Cable tie C10 to the RAM mount to
help provide strain relief.
Ensure the UC4.5 Control Panel’s power is OFF for the remaining installation.
(Bottom of switch pressed IN).
3. Connect C30 to P6A of C10 using a 2-way coupler (E12). Plug the 3-pin connector on C30
to the power bar in the cab.
4. Route the free end of C10 along the side of the cab post and under the floor mat.
The hole in the floor may be covered by a plate, or a grommet may be
installed in the hole. They can be reinstalled after the wiring is complete.
NORAC supplies a grommet for the hole if one does not exist.