Procedure – Maxim Integrated Carmel (MAXREFDES18) ZedBoard User Manual
Page 6

Carmel (MAXREFDES18#) ZedBoard Quick Start Guide
6
4. Procedure
1. Connect the Carmel board to the JA1 port of a ZedBoard as shown in
2. Connect the ±24V power supply positive terminal, negative terminal, and the
ground terminal to the AVDD, AVSS, and AGND connectors, respectively, on the
Carmel board.
3. Connect one end of the 750
Ω load resistor to the OUT and SENSEVP
connectors on the Carmel board.
4. Connect the other end of the 750
Ω load resistor to the AGND and SENSEVN
connectors on the Carmel board.
5. Verify that the JU1 and JU4 jumpers are on the 1-2 position.
6. Verify that the JU2 jumper is on the pin 1 only.
7. Power up the ZedBoard by sliding the SW8 switch on the ZedBoard to the ON
position.
8. Download the latest RD18V01_00.ZIP file at
available at the bottom of the page.
9. Extract the RD18V01_00.ZIP file to a directory on your PC. The location is
arbitrary but the maximum path length limitation in Windows (260 characters)
should not be exceeded.
In addition, the Xilinx tools require the path to not contain any spaces.
C:\Do Not Use Spaces In The Path\RD18V01_00.ZIP
(This path has spaces.)
For the purposes of this document, it will be C:\designs\maxim\RD18V01_00\.
See
Appendix A: Project Structure and Key Filenames
the project structure and key filenames.