6 installation instruction for balance, Installation instruction for balance – KERN & SOHN OEX User Manual
Page 9

6
Installation instruction for balance
• Prepare the installation site for the OEX balance in a professional manner.
• Ensure that the installation site is dry, level and firm.
• The permissible operating temperate range is from -10°C to +40°C
• The floor base for the installation of the platform balance must be firm enough
for supporting the maximum weight allowed for the load plus the platform
balance.
• Balances of the OEX series without tripod have a display unit that can be
connected to the wall via a cable with the help of a holder.
• The display unit is designed for attachment to a table or for installation on a
wall with the help of a holder.
o
Unpack the balance outside the hazardous area.
o
Remove all transport locking devices after unpacking:
o
Attach tripod to platform.
o
Feed excess cable into the tripod
.
o
Lift the weighing pan and remove the transport locking device.
Weighing cell conductor
Transport Securing
Tripod
Washer
Nut
Doc.No.OEX-BA-e-1411
9