beautypg.com

Figure 4-5 stacking the seh and sehi – Cabletron Systems SEH100TX-22 User Manual

Page 31

background image

Powering Up and Stacking the SEH

SEH100TX User’s Guide

4-7

5. Attach the interconnect cable to the “IN” port on the rear panel of the

SEH as shown in Figure 4-5.

Figure 4-5

Stacking the SEH and SEHI

6. Attach the other end of the interconnect cable to the “OUT” port on the

rear panel of the hub at the bottom of the stack.

7. Repeat steps 3 through 6 until all SEH hubs are connected.

!

CAUTION

Do not leave an interconnect cable connected at only one end
during network operation. Corrupted data may result.

100BASE-TX HubSTACK
Interconnect Cable

REAR VIEW
SEHI Managing 4 SEH Non-Intelligent Hubs

OUT

SEHI100TX INTERCONNECT

IN

SEHI

100TX

-22

100BASE-TX HUB

WITH

LANVIEW®

OUT

SEH100TX INTERCONNECT

IN

SEH

100TX

-22

100BASE-TX HUB WITH LANVIEW®

OUT

SEH100TX INTERCONNECT

IN

SEH

100TX

-22

100BASE-TX HUB WITH LANVIEW®

OUT

SEH100TX INTERCONNECT

IN

SEH

100TX

-22

100BASE-TX HUB WITH LANVIEW®

OUT

SEH100TX INTERCONNECT

IN

SEH

100TX

-22

100BASE-TX HUB WITH LANVIEW®

1511_07