beautypg.com

Checklists, It] pre-test checklist, Iti operation checklist – GE PHP960DMBB User Manual

Page 10: Splice copper wires to, Installation instructions

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

background image

Installation Instructions

CHECKLISTS

IT] PRE-TEST CHECKLIST

H Remove all protective film, if present, and any

stickers.

E Check to be sure that all wiring is secure and

not pinched or in contact with moving parts.

E Check level of appliance.

E Check that the cooktop is properly grounded.

ITI OPERATION CHECKLIST

E Remove all items from the top of the cooktop

surface.

E Turn on the power to the cooktop.

(Refer to your Owner's Manual.) Verify that all
surface burners operate properly.

E Check that the circuit breaker is not tripped

nor the house fuse blown.

E Check that conduit is securely connected to

thejunction box.

E See Owner's Manual fortroubleshooting list.

NOTE TO ELECTRICIAN:

The power leads supplied with this appliance are

UL recognized for connections to larger gauge
household wiring. The insulation of these leads
is rated at temperatures much higher than the

temperature rating of household wiring. The current

carrying capacity of a conductor is governed by the

wire gauge and also the temperature rating of the

insulation around

the wire.

NOTE: ALUMINUM WIRING

• WARNING:

IMPROPER CONNECTION OF ALUMINUM

HOUSE WIRING TO THE COPPER LEADS CAN

RESULT IN A SERIOUS PROBLEM.

Splice copper wires to

aluminum wiring using

special connectors designed and UL approved

forjoining copper to aluminum and follow
the manufacturer's recommended connector

procedure closely.

NOTE:

Wire used, location and enclosure of splices,

etc., must conform to good wiring practice and

local codes.

10

This manual is related to the following products: