GE PP975SMSS User Manual
Pp975sm, Ge profile, Series 36" built-in cleandesign electric cooktop
For answers to your Monogram
®
or GE
®
appliance
questions, visit our website at geappliances.com
or call GE Answer Center
®
service, 800.626.2000.
Listed by
Underwriters
Laboratories
†
Note: Check local codes for required
breaker size
Important: Requires a 5" free area
between the bottom of the cooktop
to any combustible material, i.e.,
shelving. Free area not required
when installing wall oven underneath
cooktop. Refer to installation
instructions. Requires a 15" minimum
from cooktop to adjacent overhead
cabinets. Units are furnished with a 48" flexible armored cable.
Note: 36" Ribbon cooktops are approved for use over GE 30"
Single Wall Ovens and Warming Drawers only. Refer to cooktop
and wall oven/warming drawer installation instructions packed
with product for current dimensional data. If installed with a GE
Profile
™
Telescopic Downdraft System, consult both the cooktop
and downdraft installation instructions packed with product
before installing. Cooktop gas/electric supply may need to be
re-routed to install downdraft. The countertop
must be at least 26" deep with a flat surface area of 23-1/2"
or more, front to back. In addition, other clearances to the
front edge of the countertop must be considered, especially on
raised bullnose countertops. Consult cabinet and countertop
manufacturer’s specs for flush mount installation prior to install.
Installation Information: Before installing, consult installation
instructions packed with product for current dimensional data.
KW Rating
240V
8.9
208V
6.7
Breaker Size
240V
40 Amps
†
208V
40 Amps
†
220592
Specification Revised 6/13
Dimensions and Installation Information (in inches)
PP975SM
GE Profile
™
Series 36" Built-In CleanDesign Electric Cooktop
CP650ST
PHP960SM
PP975SM
PP962SM
JP656SD
3-1/4*
Cooktop
2-1/2**
Required
33-7/8
19-1/8
36 1/8
21
Electrical junction
box 16" MIN.
below countertop
30" MIN. to
unprotected
cabinet
Cut should not interfere
with cabinet structure
at front
1-1/2" MIN.
(30" cooktop)
2" MIN. (Induction
and 36" cooktops)
clearance to side
wall from cut-out
1-1/2" MIN.
(30" cooktop)
2" MIN. (Induction and
36" cooktops) clearance
to side wall from cut-out
15" MIN.
to cabinet
1-3/4" to
rear wall
13" MAX.
depth
* Depth of unit at conduit connection location (rear)
is 6-1/4" on models PP975/945 and 4-3/16" on
models CP350/650, PP944/962/932/912, and
JP656/356/336. Depth of unit at baffle (front) is
4-5/8" on models PHP960/900.
**Raised bull nose countertops may require up to
3/8" additional clearance to prevent interference
with curved front.
CP650ST
PHP960SM
PP975SM
PP962SM
JP656SD
3-1/4*
Cooktop
2-1/2**
Required
33-7/8
19-1/8
36 1/8
21
Electrical junction
box 16" MIN.
below countertop
30" MIN. to
unprotected
cabinet
Cut should not interfere
with cabinet structure
at front
1-1/2" MIN.
(30" cooktop)
2" MIN. (Induction
and 36" cooktops)
clearance to side
wall from cut-out
1-1/2" MIN.
(30" cooktop)
2" MIN. (Induction and
36" cooktops) clearance
to side wall from cut-out
15" MIN.
to cabinet
1-3/4" to
rear wall
13" MAX.
depth
* Depth of unit at conduit connection location (rear)
is 6-1/4" on models PP975/945 and 4-3/16" on
models CP350/650, PP944/962/932/912, and
JP656/356/336. Depth of unit at baffle (front) is
4-5/8" on models PHP960/900.
**Raised bull nose countertops may require up to
3/8" additional clearance to prevent interference
with curved front.