Installation checklist – AXEON CRO-Series User Manual
Page 9

MKTF - 215
9
Installation Checklist
1. System is located where it will not be subject to physical impacts or rough contact by heavy objects.
2. Feed water pressure to the unit is no less than 40 psi and no greater than 80 PSI.
3. Ensure the plastic retainer clip that holds the membrane cartridge in place is fully engaged and locked in place. The slide
locks must snap into place in the slots. If the clip does not snap easily into place through the slots it means the cartridge is not
fully inserted into the connectors. Press top or bottom of cartridge to engage connectors until it snaps into place properly.
4. All tubing connections, especially push-in quick connections, are fully inserted.
5. Tubing connected between the faucet and the drain saddle fitting (the fitting attached to the sink drain pipe) runs "down-
hill" to the drain. There should be no loops or places where water would not flow out to the drain.
6. Feed water valve is open.
7. Within one to two hours after initial application of water pressure, check again for leaks especially at the tank, faucet
tubing and connectors. These parts will not see full pressure until approximately 2 hours after the system is activated.
8. Flush three tank fulls of product water to drain. If a chlorine scent persists, repeat flushing
procedure.