1) rough valve installation (j-thvc12), Figure 1, Valve rough-in shield – Jaclo Thermostatic Valve, Rough - J-TH34 User Manual
Page 3: 5 1/2" ref

jaclo
industries | 129 Dermody Street Cranford, NJ 07016
p 908.653.4433 | 800.852.3906 f 908.653.1717 | 800.852.4133
JACLO.COM | PG 3
CREATED 5.2014
| PG 3
(1) ROUGH VALVE INSTALLATION (J-THVC12)
1. Position valve assembly so outer edge of finished wall is between min./max. thicknesses marked on rough in
shield. See Fig. 1
2. Using appropriate fasteners, mount valve assembly to studs/blocking. See Fig. 1
VALVE ROUGH-IN SHIELD
INSTALLATION EXAMPLE
"JACLO INDUSTRIES PROPRIETARY INFORMATION"
THIS DRAWING CONTAIN CONFIDENTIAL PROPRIETARY
INFORMATION AND IDEAS BELONGING TO JACLO INDUSTRIES.
DRAWING ARE BEING DISCLOSED IN CONFIDENCE FOR A LIMITED
PURPOSE AND MUST BE RETURNED UPON REQUEST. IT MAY
NOT BE USED FOR ANY OTHER PURPOSE AND MAY NOT BE
REPRODUCED, COPIED, OR DISCLOSED TO OTHER PARTIES
WITHOUT THE PRIOR WRITTEN CONSENT OF JACLO INDUSTRIES.
5 3/4"
3 3/8"
5 1/2" REF.
4 3/16"
16 PT.
SPLINE
3/4" NPT 3x
5 1/2" REF.
OUT
2 3/16"
ROTATE LEVER
THERMOSTATIC
TEMPERATURE
CONTROL
C PORT
FULL ON
FULL ON
OFF
ROTATE LEVER
OFF
WARM
HOT
ROTATE LEVER
WARM
ROTATE LEVER
FOR VOLUME
CONTROL
Figure 1
TO SHOWERHEAD OR
OTHER PLUMBING
ASSEMBLY
1" THICK FINISHED
WALL OUTER EDGE
4½" Ø
Max
4½" DIA. MAX
HOLE IN WALL
SAMPLE HOLE IN WALL
TO TUB SPOUT ONLY
TWIN EL SUPPLIED