Checkline DHT-2 User Manual
Page 3

3.0 M
EASURING
P
ROCEDURE
3.1 Preparation
1. Connect the gauge to the electrodes holder using the supplied Connection
Cable.
2. Unscrew the upper plastic ring of the electrode holder, insert the
desired electrode, replace the plastic ring.
3.2 Taking A Measurement
1. Press the Power On/Off key.
2. Select one of the built-in measurement
scales by
pressing the key until the desired material
name appears on the display
(see photo). For
other materials, select the 0-100 scale.
3. Insert the prongs of the electrode
completely
into
the sample
.
4. If you are using one of the built-in measurment
scales, the percentage of humidity appears on the
LED display. For other materials use the conversion
scales (see Appendix) to convert the 0-100 reading
into a humidity percentage.
- 3 -
- 14 -
<
- Series-2 (16 pages)
- Series-3 (22 pages)
- Series-4 (26 pages)
- Series-5 (34 pages)
- FGV-XY (19 pages)
- DS2 (6 pages)
- FGE (8 pages)
- Series-5I (32 pages)
- Series-3I (24 pages)
- MG (2 pages)
- FGE-XY (6 pages)
- FB (4 pages)
- ES10 (4 pages)
- FGS-100H (2 pages)
- FGS-250W (2 pages)
- TSB100 (10 pages)
- ES30 (6 pages)
- ES05 (4 pages)
- TSA750 (10 pages)
- TSF (6 pages)
- ESM301 (27 pages)
- MX2 (8 pages)
- FGS-100PV (20 pages)
- FGS-220VC (33 pages)
- MX-500 (4 pages)
- ESMH (6 pages)
- FGS-100PX (20 pages)
- ZP (10 pages)
- WT-100 (2 pages)
- AWS-4050 (14 pages)
- TI-25LT (9 pages)
- TI-25S (11 pages)
- TI-25M (13 pages)
- TI-25DL (19 pages)
- TI-25M-MMX (15 pages)
- TI-25DL-MMX (17 pages)
- TI-007 (9 pages)
- TI-007DL (11 pages)
- TI-CMX (29 pages)
- TI-CMXDL (35 pages)
- TI-CMXDLP (54 pages)
- TI-MVX (42 pages)
- TI-UMX2 (29 pages)
- TI-25P (11 pages)
- TI-44N (11 pages)