Other test stands by mark-10, Unpacking and setting up, List of included items – Checkline ES05 User Manual
Page 3

Model ES05
5
OTHER TEST STANDS BY MARK-10
TST
TSB
TSA
TSCH
TSAH
TSTH
TSTM
TSTMH
TSFH
TSF
TSC
ESM
ES30
User’s Guide
2
UNPACKING AND SETTING UP
1. Carefully unpack the stand and inspect for any damage.
Inspect the contents to ensure that you have received a test
stand complete with all accessories – see List of Included
Items below.
2. Place the stand on a firm, flat and level working surface free
from vibration to ensure accurate readings.
3. Save original packaging materials in case future transporta-
tion is required.
Quantity
Item
1
Force measurement test stand
1
User’s guide (this booklet)
4
Thumb screws for gauge mounting
LIST OF INCLUDED ITEMS
Optional base plate 14-1068
Steel base plate has 25 #10-32 thread
holes for fixture mounting
- Series-2 (16 pages)
- Series-3 (22 pages)
- Series-4 (26 pages)
- Series-5 (34 pages)
- FGV-XY (19 pages)
- DS2 (6 pages)
- FGE (8 pages)
- Series-5I (32 pages)
- Series-3I (24 pages)
- MG (2 pages)
- FGE-XY (6 pages)
- FB (4 pages)
- ES10 (4 pages)
- FGS-100H (2 pages)
- FGS-250W (2 pages)
- TSB100 (10 pages)
- ES30 (6 pages)
- TSA750 (10 pages)
- TSF (6 pages)
- ESM301 (27 pages)
- MX2 (8 pages)
- FGS-100PV (20 pages)
- FGS-220VC (33 pages)
- MX-500 (4 pages)
- ESMH (6 pages)
- FGS-100PX (20 pages)
- ZP (10 pages)
- WT-100 (2 pages)
- AWS-4050 (14 pages)
- TI-25LT (9 pages)
- TI-25S (11 pages)
- TI-25M (13 pages)
- TI-25DL (19 pages)
- TI-25M-MMX (15 pages)
- TI-25DL-MMX (17 pages)
- TI-007 (9 pages)
- TI-007DL (11 pages)
- TI-CMX (29 pages)
- TI-CMXDL (35 pages)
- TI-CMXDLP (54 pages)
- TI-MVX (42 pages)
- TI-UMX2 (29 pages)
- TI-25P (11 pages)
- TI-44N (11 pages)