beautypg.com

6 operation – BUCHI NIRMaste Pro IP65 User Manual

Page 24

background image

6 Operation

24

NIRMaster Operation Manual, Version B

6 Operation

This section describes how to start a measurement and how to prepare a reference measurement
and gives recommendations on possible applications of the instrument. Additional information can be
found in the NIRWare online help.

NOTICE

Risk of instrument damage at use with engaged transportation lock.
• Disengage the transportation lock prior use
• Keep shocks and vibrations away

6 .1

Initializing the system

Before starting the NIRMaster, switch ON the monitor a. To start the NIRMaster press the green
power button on the left side of the instrument for 1 – 3 seconds b. The indicator light at the housing
front will light up yellow, to indicate the bootup process. After approximately 60 seconds the indicator
light will change from yellow to green c and the instrument is ready to use (respectively to log in).

+

a

b

c

1 – 3 sec.

Yellow

~ 60 sec.

Green

NIRWare / Login

Switch ON the monitor