beautypg.com

Radiance direct vent /natural vent gas heater – Vermont Casting 3225 User Manual

Page 16

background image

17

Radiance Direct Vent /Natural Vent Gas Heater

20004188

For DuraVent pipe only: Install vent pipe by align-

ing the locking system together, sliding the pipes
together and twisting clockwise.

Install 90° elbow. Twist lock as before.

Slide the wall plate over horizontal run before at-

taching the horizontal run to the elbow. Fasten wall
plate to wall.

4. For CFM Vent Pipe only: If necessary, measure

to determine the vertical length (X) of pipe required
from the adapter pipe to the wall cutout centerline,
including a 2” overlap at the joint. (Fig. 26) use a
hacksaw or tin snips to trim the pipe as needed.

ZCS103

Zero Clearance Sleeve

& Firestop

12/6/99 djt

12”

(305mm)

Max. Length

Sleeve

#8 Sheet

Metal Screws

Firestop

ZCS103

Fig. 25 Assemble the wall sleeve and firestop.

5. Install first the inner then the outer straight pipe

section(s), trimmed end down, to the point of the el-
bow. Drill 3 holes through each joint and fasten with
sheet metal screws.

X

ST652

Fig. 26 Determine the vertical pipe length.

6. Install the elbow using 3 sheet metal screws at each

joint.

7. Measure, and cut if needed, the appropriate length

of pipe section needed to make the connection
through the wall. Include a 2” overlap; i.e. from the
elbow to the outside wall face, about 2” or the dis-
tance required if installing a second 90° elbow. (Fig.
27)

8. Slip the wall plate and trim collar over the interior

end of the horizontal pipe and install into the wall
sleeve. Seal the joint inside the wall plate if needed
to keep cold air from being drawn into the home.

9. Connect the horizontal pipe to the elbow. Fasten the

wall plate to the pipe with three sheet metal screws.
Slide the trim collar up against the wall plate to cover
the screws. (Fig. 28)

ST215

measure thru wall

12/6/99 djt

X

ST215

Fig. 27 Measure the horizontal length.

ST216

install pipe thru wall

12/6/99 djt

Trim Collar

Wall

Sleeve

Wall Plate

ST216

Fig. 28 Install the horizontal pipe and wall plate parts.

10. For both CFM and DuraVent Systems: Install the

vent terminal. (Fig. 29) Apply high temperature seal-
ant one inch from the ends of the inner and outer
collars. Guide the inner and outer vent termination
collars into the adjacent pipes. Double check that
the vent pipes overlap the collars by 2”. Fasten the
termination to the wall with the screws provided, and
caulk the joint with weatherproof sealant.

This manual is related to the following products: