Installation – B&C Technologies HP Series Commercial User Manual
Page 26
25
Installation
Steam Connection
Never touch internal or external steam pipes, connections, or
components. These surfaces can be extremely hot and will cause severe
burns. The steam must be turned off and the pipe, connections, and
components allowed to cool before the pipe can be touched
For machines equipped with optional
steam heat, install piping in accordance
with approved commercial steam
practices. Steam requirements are shown
in the table below. Failure to install the
supplied steam filter may void the
warranty.
STEAM INLET and CONSUMPTION:
Steam inlet size
DN
in
13
1/2
Required steam to heat bath 10F (5.55C)LOW
kg
lbs
1.5
3.2
Required steam to heat bath 10F (5.55C)HIGH
kg
lbs
1.8
4
Average Steam consumption per cycle
kg
lbs
31
66
UNITS
HP-60