Or parts grouped by carton – Workrite Sierra Crank Assembly Instructions for Front and Top-Crank models User Manual
Page 3
Workrite Ergonomics | 800.959.9675 www.workriteergo.com
3
Workrite Sierra™ Crank Workcenters - Assembly Instructions
H
Crossbar
Qty: 1
A
Tabletop (size and shape differ for each model)
Qty: 1
B
Leg
Qty: 2
K
5
/
32
" Allen Wrench
Qty: 1
J
¼-20 x ⅝” Button
head Machine Screws-
Qty: 4
N
Crank Handle Assembly
Qty: 1
P
#12 x ¾" Phillips-
head Screws
Qty: 20
OR
Parts grouped by carton
2-leg tables
M
Long End Hex
Shaft
Qty: 1
L
Short End Hex
Shaft
Qty: 1
O
Crank Handle
Connector
Qty: 1
1
Verify that you have all the hardware and tools needed for the assembly
Check your cartons against the lists on page 2 and 3 to verify that you have all the parts needed.
You will also need the following tools:
#2 tip Phillips screwdriver or drill bit
#3 tip Phillips screwdriver or drill bit
If you do not have a Workrite tabletop, you will also need a:
⅛” pilot drill bit ¾” wing type wood drill bit
Top-crank models only
For 3-leg 90º tables, please proceed to Step 2 on page 4.
For 3-leg 120º tables, please proceed to Step 2 on page 6.
For 2-leg front-crank tables, please proceed to Step 2 on page 8.
For 2-leg top-crank tables, please proceed to Step 2 on page 9.
or
I
Crank Tube
Qty: 1
Q
Crank Handle
Qty: 1
¾
P
#12 x ¾" Phillips-
head Screws
Qty: 20