A b c – Workrite Sierra Crank Assembly Instructions for Front and Top-Crank models User Manual
Page 12
12
Workrite Ergonomics | 800.959.9675 www.workriteergo.com
Workrite Sierra™ Crank Workcenters - Assembly Instructions
HANDLE UP AND OUT
HANDLE DOWN AND OUT
HANDLE UP AND IN
HANDLE DOWN AND IN
HANDLE UP AND OUT
HANDLE DOWN AND OUT
HANDLE UP AND IN
HANDLE DOWN AND IN
7
a
b
c
Tighten All Screws and Flip Table Over
Tighten all Wood Screws connecting handle and legs to desk.
Flip table over and adjust Leveling Glides if required so that table is steady and does not rock.
Top-Crank models only: Insert Crank Handle into hole in worksurface over
the right leg so that it engages the gearbox. Turn Handle to raise or lower table.
8
Front Crank models only: Store Crank
Pull out and turn handle to raise or lower table.
Before storing the crank under the desk, lift the handle slightly higher than the desk before pushing
back down to the proper position. If it is too low to begin with and is raised only slightly it will tend
to drop.
Push the crank under the desktop for storage.
a
b
c
b
c