Ba c c – Workrite Sierra Crank Assembly Instructions for Front and Top-Crank models User Manual
Page 11
Workrite Ergonomics | 800.959.9675 www.workriteergo.com
11
Workrite Sierra™ Crank Workcenters - Assembly Instructions
¾
6
a
b
Base-Only Top-Crank models: Secure Table Base to Tabletop
For Base-Only Front-Crank models please see page 10.
Position the leg assembly on the face-down table top. Center the assembly on the table so that
neither of the side legs overlap the edge. Measure carefully to ensure that your table will be
positioned correctly as detailed below before drilling.
Mark ¾" hole for crank handle: Trace around outside of leg bracket before removing leg
assembly. Measure from front left corner of leg bracket as shown, then mark hole placement. The
hole should be directly under the center of the leg.
Use the ⅛" drill bit to drill from the bottom of the worksurface completely through the
worksurface as step one in drilling.
Turn the worksurface over to the top/good finish side and use the ¾" wing drill bit to finish
drilling the hole from the top down, to ¾" diameter, using the ⅛" hole as a guide.
Flip table back and reposition leg assembly.
Drill pilot holes and insert screws for two positioning holes first being sure to center the leg over
the crank handle hole, then use the other screw holes to mark the location of the remaining holes
for each leg. Attach the desk at all points.
b
a
c
c
1¼"
6½"
var.
var.
d
d