beautypg.com

Ba c c – Workrite Sierra Crank Assembly Instructions for Front and Top-Crank models User Manual

Page 11

background image

Workrite Ergonomics | 800.959.9675 www.workriteergo.com

11

Workrite Sierra™ Crank Workcenters - Assembly Instructions

¾

6

a

b

Base-Only Top-Crank models: Secure Table Base to Tabletop

For Base-Only Front-Crank models please see page 10.

Position the leg assembly on the face-down table top. Center the assembly on the table so that

neither of the side legs overlap the edge. Measure carefully to ensure that your table will be

positioned correctly as detailed below before drilling.

Mark ¾" hole for crank handle: Trace around outside of leg bracket before removing leg

assembly. Measure from front left corner of leg bracket as shown, then mark hole placement. The

hole should be directly under the center of the leg.

Use the ⅛" drill bit to drill from the bottom of the worksurface completely through the

worksurface as step one in drilling.

Turn the worksurface over to the top/good finish side and use the ¾" wing drill bit to finish

drilling the hole from the top down, to ¾" diameter, using the ⅛" hole as a guide.

Flip table back and reposition leg assembly.

Drill pilot holes and insert screws for two positioning holes first being sure to center the leg over

the crank handle hole, then use the other screw holes to mark the location of the remaining holes

for each leg. Attach the desk at all points.

b

a

c

c

1¼"

6½"

var.

var.

d

d