Rope winch/rescue lifting device – Vetter Litepod ART-LP User Manual
Page 20

Page 6/15
Rope winch/Rescue lifting device
If the equipment has been stressed by a fall, the written consent
of an expert person is required before the equipment can be de-
ployed again.
A plan of the rescue measures must be available and the plan
must be taken into consideration when working on possible
emergencies.
Do not make any modifications or additions to the equipment wi-
thout prior, written consent from the manufacturer. Likewise, per-
form corrective maintenance only in compliance with the measu-
res stated by the manufacturer.
If you have any specific questions or doubts about the safety of
the AT200/3 rescue lifting device, please get in touch with Vetter
GmbH.
ATTENTION: Check and if applicable re-tighten all
threaded connections before the
deployment.
CAUTION:
9
Do not change cable and check that the cable in place is free
of damage. Otherwise, do not use the lifting device and con-
tact Vetter GmbH.
9
Do not use the lifting device if it shows any signs of damage,
deformation or specific wear.
9
Do not modify the lifting device or any of its accessories.
9
Never install the lifting device on a different structure that
might be suspected of not being strong enough. This strength
shall include the possibility of an impact force due to inad-
vertent falling and must therefore be greater than 1000 daN
(approx. 1000 kg).
9
Never install the lifting device in a position that is liable to
cause the load to swing or turn.