beautypg.com

Vetter SP 16 User Manual

Page 13

background image

Page 12/15

Test regulation for the checks to be carried out with fal-
ling loads after each use or by persons to be rescued if
required so in an emergency situation.

1. Visual inspection of the cleaned safety cushion, in order to

identify external damage under deflated conditions (upper &

lower tarpaulin).

2. Inflate the safety cushion.
3. Visual inspection of the following components, in order to

identify visible damage:
landing area

9

side tarpaulins

9

bottom tarpaulin

9

central partitioning wall

9

seams and bonding areas

9

(heat protection cover, if necessary)

9

carrier loops

9

cylinder mounting

9

control zip with seal

9
4. Internal inspection to identify foreign bodies
5. Unscrew the valve core of the vent valve
6. Insert the test manometer (Art. No.: 1530 0021 00)
7. Set the internal pressure of the supporting structure to 0.25

bar. The internal pressure must not decrease by more than 10

% within 60 min.

8. The safety valve must close tightly. Check the tightness of the

safety valve, if necessary.

9. Open the zip, in order to visually check the proper condition

of the bonded and stitched seams.

10. Close the zip and re-seal it.
11. Remove the test manometer and screw in the valve core of

the vent valve.

12. Check the tightness of the air vent valve.
13. Check the tightness of the filling socket (with soapy water).

Repairs of any kind must only be carried out by the manufacturer
or by a special firm duly authorized by the manufacturer.
If there are any doubts about the reliable functioning or the safety
of the Vetter safety cushion please contact the manufacturer.