beautypg.com

Vetter SP 16 User Manual

Page 11

background image

Page 10/15

Start the packing only when the air has been completely dischar-
ged from the carrier frame.
Lay out the safety cushion evenly in a square pattern. Put the up-
per and lower supporting hoses on top of each other and press
the tarpaulin of the side walls inside by applying even pressure.
Starting position and front side is the connecting side to the com-
pressed air bottle. Take the adjoining left-hand side to the com-
pressed air bottle. Tilt again to the upper edge of the body of the
bottle.
Tilt the right side of the cushion to the centre.

Lay out to the left again to make a total width of approx. 850
mm.

You now roll the safety cushion towards the compressed-air cylin-
der as tightly as possible. The width of the rolled-up safety cushi-
on must not exceed 900 mm.
Any air in the carrier-frame van escape via the vent valve which is
still open

If necessary, suction out the remaining air from the sup-
port frame once again using the vacuum adapter!

Once the remaining air has completely escaped

close the vent valve !!!

In order to do so, pull off the air vent key (the valve will then close
automatically) and press the rubber plugs into the valves.
Position a tested and filled compressed air bottle into the bottle
holder and connect with the inflation hose. Check the padding in
the bottle holder to ensure correct position.