Vetter Test Equipment for Lifting Bags

Page 11/28

tilation head. Fill the bag to the test pressure by connecting the

hand pump.
To do this position the red ball valve (A) vertically and operate the

lever on the pump. Slowly and evenly build up a pressure.

Mini lifting bag 8 bar = 10.4 bar test pressure/water

The bag under pressure should remain like this for a

minimum of 3 minutes but a

maximum of 5 minutes

Within this time the specialist can test the bag for leaks, deforma-

tions or other forms of damage.
The water can be drained in order to empty the bag after the test

has finished. To do this completely open the ventilation valve (B).

Couple the test and ventilation head. Position the bag vertically to

completely empty making sure that the nipple is pointing down-

wards. However the connection nipple must not be loaded down

by the weight of the bag.

Blow the fixtures out with compressed air after use.

6.

Testing the S.Tec lifting bags 10 bar

6.1 Function test of the inflation device

6.1.1 Required test equipment

9

Test manometer 10 bar

6.1.2 Preparation and implementation of the

test

corresponds to the visual test and function test 8 bar

6.2 Pressure testing of S.Tec lifting bags

10 bar

The pressure test corresponds to the pressure test for the mini lif-

ting bag 8 bar in individual points.
The S.Tec test adapter must be connected between the S.Tec bag

10 bar and the test and ventilation head.

S.Tec bag 10 bar = 13 bar test pressure of water