beautypg.com

Tjernlund SS2 SideShot with UC1 Universal Control (Version X.06) 8504105 Rev C 07/05 User Manual

Page 14

background image

11

SIDESHOT WITH INTEGRAL UC1 UNIVERSAL CONTROL CONNECTED TO A

HONEYWELL R8184 SERIES OR EQUIVALENT PRIMARY CONTROL

50/60 Hz

R

WHITE

ORANGE

BLACK

HONEYWELL

R8184 SERIES

OR EQUIVALENT

IGNITION TRANS

BURNER MOTOR

WHITE

SUPPLY
115 VAC

BLACK

UNIV

E

R

S

A

L CONT

ROLLE

R

XN

RED JUMPER POSITION MUST BE THE SAME

IMPORTANT:

AS APPLIANCE INTERLOCK VOLTAGE.

J1

XL

J2

115V

DRY

24V

115 VAC

LEGEND:

CALL
JUMPER

SPADE TERMINAL IN ELECTRICAL BOX.

GROUND

CRIMP GROUND WIRE TO GROUNDING

IMPORTANT:

D/N 9183046-2 10/16/03

L1 OR B1

CONNECT TO

CONNECT TO

L2 OR B2

WHITE

SIDESHOT WITH INTEGRAL UC1 UNIVERSAL CONTROL CONNECTED TO A HONEYWELL R7184

SERIES OR EQUIVALENT PRIMARY CONTROL WITH A LINE VOLTAGE THERMOSTAT OR AQUASTAT

Burner

Alarm

Cad Cell

A

Interrupted

Intermittant

Motor

A

IGNITION TRANS

BURNER MOTOR

SUPPLY
115 VAC
50/60 Hz

R

Oil Valve

Limit

R7184

L1

T

T

L2

OIL VALVE

115 VAC

60 Hz

SUPPLY

Limit

24

V

DRY

115
V

XL

UNIVERSAL

CONT

ROL

LE

R

XN

J1

J2

RED JUMPER POSITION MUST BE THE SAME

AS APPLIANCE INTERLOCK VOLTAGE.

IMPORTANT:

D/N 9183046-6

115 VAC

LEGEND:

CALL
JUMPER

Ignitor

CRIMP GROUND WIRE TO GROUNDING SPADE TERMINAL IN SS2 ELECTRICAL BOX.

IMPORTANT:

Line Voltage Thermostat

or Aquastat Control

Low Voltage
Jumper

1. Separate the Black burner motor wire from the Orange wire of R8184 Primary Control.

NOTE: Do not separate the ignition transformer wire from the Orange.

2. Connect Orange wire of R8184 to #1 on UC1 terminal block.
3. Connect #2 on UC1 terminal block to White on R8184 and L2 or B2.
4. Connect Black of burner motor to #4 on UC1 terminal block.
5. Connect 115 VAC supply voltage to L & N terminals on UC1. Installer must supply overload and disconnect protection.
6. Crimp ground wire to grounding spade in SS2 electrical box.
7. Make sure RED voltage jumper on UC1 is on 115V.

1. Disconnect burner motor wire off the R7184.
2. Connect burner motor terminal of R7184 to #1 on UC1 terminal block.
3. Connect #2 on UC1 terminal block to L2 or N.
4. Connect #4 on UC1 terminal block to burner motor wire removed from R7184.
5. Connect 115 VAC supply voltage to L & N terminals on UC1. Installer must supply overload and disconnect protection.
6. Crimp ground wire to grounding spade in SS2 electrical box.
7. Make sure RED voltage jumper on UC1 is on 115V.