Tjernlund SS1C SideShot with UC1 Universal Control (Version X.04) 8504103 Rev C 02/04 User Manual
Page 16

15
SIDESHOT WITH INTEGRAL UC1 UNIVERSAL CONTROL CONNECTED
WITH A SINGLE ZONE 24 VAC THERMOSTAT
XN
R
U
N
IVER
SAL C
O
N
T
R
O
LLER
THERMOSTAT
G
G
INTERNAL CONTROL
OF FURNACE
W
C
Y
R
R
Y
AS APPLIANCE INTERLOCK VOLTAGE.
RED JUMPER POSITION MUST BE THE SAME
XL
J1
J2
W
DRY
115V
24V
IMPORTANT:
D/N 9183046-5
115 VAC
24 VAC
LEGEND:
CALL
JUMPER
50/60 Hz
SUPPLY
115 VAC
SPADE TERMINAL IN ELECTRICAL BOX.
GROUND
CRIMP GROUND WIRE TO GROUNDING
IMPORTANT:
1. Connect W from t-stat to #1 on terminal block of UC1.
2. Connect #2 on UC1 terminal block to C on internal control terminal strip of furnace/boiler.
3. Connect #4 on UC1 terminal block to W on internal control terminal strip of furnace/boiler.
4. Connect 115 VAC supply voltage to L & N terminals on UC1. Installer must supply overload and disconnect protection.
5. Crimp ground wire to grounding spade in SS1C electrical box.
6. Make sure RED voltage jumper on UC1 is on 24V.
NOTE: If burner primary control goes out on lockout, the SideShot will continue to run as long as a call for heat is present.
SIDESHOT WITH INTEGRAL UC1 UNIVERSAL CONTROL CONNECTED TO AN OIL-FIRED FURNACE
WITH A HONEYWELL T87 OR EQUIVALENT NON-POWERED THERMOSTAT
XN
R
UNIV
E
RS
A
L CO
NTRO
LLE
R
REMOVE JUMPER TO AVOID
AS APPLIANCE INTERLOCK VOLTAGE.
RED JUMPER POSITION MUST BE THE SAME
XL
J1
J2
DRY
115V
24V
IMPORTANT:
BACKFEEDS OR SHORT
50/60 Hz
SUPPLY
115 VAC
NON-POWERED THERMOSTAT
F
F
T
T
D/N 9183047-1
PRIMARY CONTROL
SPADE TERMINAL IN ELECTRICAL BOX.
GROUND
CRIMP GROUND WIRE TO GROUNDING
IMPORTANT:
OR EQUIVALENT
5 VDC BOARD-GENERATED
LEGEND:
115 VAC
DO NOT SUPPLY POWER!
POWER.
LOW VAC
HONEYWELL T87 OR EQUIVALENT
W
O
WHITE
ORANGE
B
BLACK
HONEYWELL
R8184 SERIES
IMPORTANT:
FACTORY-
WIRED
CIRCUITS.
1. IMPORTANT: Remove J1 & J2 Call Jumper on UC1 to avoid backfeeds or short circuits.
2. Connect T87 or Equivalent non-powered thermostat to A and B terminals on UC1.
3. Remove T T Jumper from R8184 or equivalent Primary Control.
4. Connect #3 on UC1 terminal block to T terminal of Primary Control.
5. Connect #4 on UC1 terminal block to remaining T terminal of Primary Control.
6. Connect 115 VAC supply voltage to L & N terminals on UC1. Installer must supply overload and disconnect protection.
7. Crimp Ground wire to grounding spade in SS1C electrical box.
8. Make sure RED voltage jumper on UC1 is on DRY.
NOTE: If burner safety control goes out on lockout, the SideShot will continue to run as long as a call for heat is present.