Smart Power Systems SSP UPS User Manual
Page 27

24
7. Tighten all screws on the front panels. Setup for front side rack-mount is
completed.
4. INSTALLATION
8. Align two small mounting brackets at the rear of Host and EBM and secure
with the supplied screws. Install Output receptacles at the rear panel of the
Host.
9. Setup rack-mount is completed and connected to the UPS.