Reliance Controls 30216BRK User Manual
Page 10
For some applications it may be desirable to connect the power cord from the generator to a power inlet box (not
included in this Kit) that is located some distance away from the transfer switch (see Figure 8). For installation,
refer to the manufacturer's instructions for both the power inlet box and the drop-cord connector. The connection
to the transfer switch still must be made using the power inlet on the front of the transfer switch. As shown in
Figure 8, this can be accomplished by installing a short drop cord to a junction box next to the transfer switch.
Insure wiring meets all applicable codes including the proper wire sizes and strain relief for the short drop cord.
Figure 8 - 30A Installation
You want your generator to be ready when you need
it -- so, it is important to perform the following steps
once a month:
•
Start and run generator power through your
transfer switch circuits.
•
Keep your fuel tank filled with fresh fuel.
With your Reliance Controls transfer switch installed,
it is not necessary to turn off any of your load center
breakers when starting your generator, even when
utility power is fully functional. This is because the
double throw break-before-make action of the
transfer switch prevents feeding generator power to
the utility and, conversely, prevents feeding utility
power back to your generator.
Do not operate your
generator in an enclosed
area
A. Transferring from Utility Power to
Generator Power in an Emergency
1.
Make sure that all switches on the Reliance Controls
transfer switch are in the LINE position.
2.
Plug the male end of your power cord into the
generator.
3.
Plug the female end of your power cord into the
transfer switch or the optional power inlet box (see
below).
4.
Start your generator outdoors and let it warm to a
point where it is running evenly.
5.
Turn the toggle switches on your Reliance transfer
switch to the GEN position one at a time.
6.
Monitor the wattage load on your generator using the
wattmeters
B. Transferring back to Utility Power When
the Power Is Restored
1.
Move all switches on the Reliance Controls transfer
switch back to the LINE position.
2.
Turn off your generator.
3.
Unplug your power cord and store it indoors
.
OPERATING INSTRUCTIONS
Page 9
OPTIONAL POWER INLET BOX
Figure 8 - 30A Installation Shown