General-info – Oldcastle BuildingEnvelope Signature Series Unit Wall User Manual
Page 4
July 2013
03-General-Info
1-866-Oldcastle (653-2278) www.oldcastlebe.com
PRODUCT USE
The unitized curtain wall system is intended for installation by glazing professionals with appropriate
experience. Subcontractors must be qualified to provide field instruction and project management.
Oldcastle BuildingEnvelope does not control the application of its product configurations, sealant or
glazing material and assumes no responsibility for the application. It is the responsibility of the owner,
architect and installer to make these selections in strict compliance with applicable laws and building
codes.
Consult silicone sealant manufacturer for review and recommendation of sealant application. Follow
sealant manufacturer's recommendations and literature for proper cleaning, testing and application of
silicone sealant.
The air and water performance of the unitized curtain wall is directly related to the completeness and
integrity of the installation process. To ensure top performance for this system, particular attention
should be given to the following procedures:
1. Surface to be sealed should be cleaned with isopropyl alcohol or solvent and dried as
recommended by sealant manufacturer to remove dirt and cutting oils.
2. Vertical movement of mullion at intermediate floors requires special expansion joints and glazing
materials. The system permit maximum +/-3/4" movement. For designs and applications that may
require greater movement or special considerations, please contact your local Oldcastle
BuildingEnvelope facility.
Variations on the details shown may occur, but are not the responsibility of Oldcastle
BuildingEnvelope.
PROTECTION AND STORAGE
Handle all material carefully. Do not drop from the truck, stack with adequate separation so the
material will not rub together. Store material off the ground, protecting against the elements and other
construction hazards by using a well ventilated covering. Remove material from package if wet or
located in a damp area. For further guidelines consult AAMA publication "Care And Handling of
Architectural Aluminum From Shop To Site".
CHECK MATERIAL
Check all material upon arrival at job site for quality and to determine any shipping damage. Using the
contract documents, completely check the surrounding conditions that will receive your materials.
Notify the general contractor by letter of any discrepancies before proceeding with the work. Failure to
do so constitutes acceptance of work by other trades.
GENERAL INFORMATION
SIGNATURE SERIES UNIT WALL INSTALLATION MANUAL
®
®
®