beautypg.com

Follow start up procedures before leaving the job – Environmental Water Systems TT 1054 TWIN TANK User Manual

Page 3

background image

www.EWSWATER.com

EWS, Inc. / Environmental Water Systems

4.3-3

INSTALLATION SUMMARY - SOFTENERS

Step 1: Locate the following:

Main Water Supply Line, Soft Water Loop or Inlet to Water Heater(s) (depending on application

or restrictions)

Drain Access, Electrical Outlet and Clearances.

Step 2: Check the incoming Water Pressure. Install a pressure regulator (PRV) if the water pressure

exceeds or can surge above 75 PSI.

Step 3: Place the tank where you want to install the unit, making sure the tank is level and on a firm base,

noting the clearances necessary to complete the installation.

Step 3A: TT Units or “Twin Tank” style, place separate brine tank 6” from softener resin tank.

Connect the safety brine assembly found in the brine tank to the 3/8” plastic compression fitting,
then pass the tubing through the hole provided in the brine tank and connect to brass compres-
sion fitting on side of valve.

Warning: Do not exceed connecting distance determined by the length of 3/8” OD poly tube provided.

Step 3B: Cabinet Units “all-in-one” style softeners have the brine tank incorporated within the cabinet

along with the resin tank. The connection between the valve and the safety brine assembly has
been factory assembled.

Step 4: Install at barbed connection on brine tank side, min. 5/8” OD tubing (not supplied) to a suitable

drain.

Warning: This is a gravity fed tank drain, in any event that could cause an overflow of the brine tank.

Step 5: Tighten the Valve on the Tank.
Caution: Since handling and moving the unit may loosen the valve head - Hand Tighten the Valve Head in a
Clockwise Direction. Make sure tank cover, if applicable does not interfere or cut into the connection.

Step 6: Identify Water Supply.

Connect raw water supply to bypass inlet connection.
Connect treated water bypass outlet to home service line.

Units: RT935, RT1035 and TT1054 come with dual port bypass valve and male yoke

TT1354-11/2” needs the bypass plumbed by the installer (see additional details)

Warning: Plumb the unit with the bypass and the male yoke included, or for larger brass valves, a bypass
must be plumbed with 3 shut-off valves and unions. Do not cross-connect or plumb backwards.

UNTIL START-UP PROCEDURES - KEEP ALL VALVES TO/FROM SYSTEM CLOSED

Step 7: Connect a backwash drain line (1/2” or 3/4”) based on application and an air gap.

Warning: The performance of softeners are dependent on the proper flow rates for regeneration discharge

FOLLOW START UP PROCEDURES BEFORE

LEAVING THE JOB

This manual is related to the following products: