beautypg.com

EFCO 8800 Series Assembly Instructions Vol.6 User Manual

Page 7

background image

EFCO 2009

Page 7

Series 8700 / 8800 Unitized Curtain Wall Assembly Instructions - Volume 6

Section 33 - Shadow Box Assembly

12. Apply silicone sealant into the voids formed by the panel, tape, and shadow box frame being sure to fill the void completely.
13. Tool the sealant smooth and flush with the panel and the shadow box frame. The sealant joint should be continuous around all four sides of the shadow box

panel assembly. Allow proper cure time for the sealant joint before proceeding to the next step.

Figure 9

Apply silicone

sealant.

WM86

Glazing Tape

Shadow

Box Frame

Apply silicone

sealant.

Shadow

Box Frame

Figure 10

This manual is related to the following products: