beautypg.com

Samson DOUBLE BRAID Class II Eye Splice Modified for TS-II and TS-II Premium User Manual

Page 4

background image

PAGE 4 OF 5

SamsonRope.com

| Email

[email protected]

| Tel

+1.360.384.4669

Double Braid Class II Eye Splice Modified for TS-II and TS-II Premium

S A M S O N S P L I C I N G I N S T R U C T I O N S

6

step

Using a tubular fid, insert 1/2 volume cover tail

into core tail at Mark D, and exit at Mark E. Make

sure there is no cover slack between the pin and

Mark T, then pull cover tail to tighten up cover/

core crossover.

6

A

Thoroughly milk core tail from Mark D to Mark

E. Make a mark on the 1/2 volume cover tail

where it exits the core tail. Pull on cover tail to

expose several inches. Cut cover tail off at the

exit mark and perform angle taper.

6

b

Re-milk core tail from Mark D to Mark E.

Cover tail should disappear inside core tail.

You are now ready to bury the core tail into

the core loop.

Mark 2

No cover slack

Mark t

Mark d

Mark e

Pull

Mark 2

Mark t

Mark d

Mark e

Cut tail at mark

Cut remaining

tail at an angle

i n s e rt i n g c o v e r i n t o c o r e

7

Tightly tape the end of the core tail and insert into fid.

Secure the core tail to the fid with a wrap of tape.

step

Note: When splicing thimble eye, slide

thimble in place between Marks 2 and 3

before attaching fid.

7

A

Insert the fid into the core

loop at Mark A. By alternately

pushing the fid forward and

milking the core loop back

towards Mark A, feed the fid

and core tail through the core

loop past Mark B, alongside of

the control core and bring out

at Mark C.

Mark 3

Mark 2

Mark a

Mark B

control core

Mark c

B u ry i n g c o r e ta i l i n t o c o r e l o o p

7

b

Pull core tail through core loop until

Mark 2 on cover meets Mark A on core

loop. Remove pin between Marks 2

and 3, and place through core loop at

junction of Mark 2 and Mark A.

Mark c

Mark B

Mark a

Mark 3

Mark 2