Samson DOUBLE BRAID Class II Eye Splice Modified for TS-II and TS-II Premium User Manual
Page 2
PAGE 2 OF 5
SamsonRope.com
| Tel
+1.360.384.4669
Double Braid Class II Eye Splice Modified for TS-II and TS-II Premium
S A M S O N S P L I C I N G I N S T R U C T I O N S
Bend rope sharply at Mark 3. Using an awl or
similar device, carefully pry the cover strands apart
to create an opening. Using the awl, carefully pry
the core out of the cover. Make sure the pin placed
between Marks 2 and 3 stays in place.
3
step
Mark 3
Mark 2
e x t r a c t i n g t h e c o r e
3
A
With rope positioned as shown,
pull on core in the direction shown.
You will need to expose a minimum
of 3 fid lengths of core.
4
A
Bend the primary (load bearing)
core sharply at Mark B. Carefully
pry the strands apart to expose the
control (inner) core. Carefully pry the
control core out of the primary core,
and pulling in the direction shown,
completely remove it.
Find the mark on the core made previously
through the cover at Mark 3. This is Mark A.
From Mark A, measure back a distance of
1-1/4 fid lengths, make Mark B. From Mark B,
measure back a distance of 1-1/2 fid lengths
and make Mark C.
4
step
Pull
3 fid lengths
Mark 3
Mark 2
Mark 1
Mark a
Mark c
Mark B
1-1/4 fid lengths
1-1/2 fid lengths
Mark 3
Mark 2
Mark 1
Mark a
Mark c
Mark B
Primary core
control core
Pull
Mark 3
Mark 2
Mark 1
M a r k i n g t h e c o r e