Sb bender -bending instructions – Pro-Tools 105B User Manual
Page 13

105-SB BENDER
-BENDING INSTRUCTIONS-
813-986-9000
PAGE 13
PRO-TOOLS
FIG. C
FIG. D
INSTALL SWING ARM PIN IN NEW HOLE IN DIE & RUN THROUGH STROKE AGAIN.
REPEAT PROCESS AS MANY TIMES AS NECESSARY.
AFTER LAST STROKE BACK OFF TENSION BOLT BEFORE RETRACTING CYLINDER.
SWING QUICK RELEASE WITH BACKING BLOCK TOWARD THE REAR OF THE BENDER
TO RELEASE TUBE.
TENSION BOLT