beautypg.com

Priming – Carrier 794 User Manual

Page 26

background image

22

Models 750, 751, 754, 774, 794

Operating Procedures

Step 9

Assemble the hopper gasket around the top edge of

the mix hopper. Stand the air tube in the corner of the

hopper.

Figure 30

Repeat steps 1 through 9 for the other side of the

freezer on Models 754, 774 and 794.

Priming

Step 1

With a pail beneath the door spout, lower the draw

handle. Be sure the prime plug is still in the UP

position. Pour two gallons (7.6 liters) of fresh mix into

the mix hopper and allow it to flow into the freezing

cylinder. This will force out any remaining sanitizing

solution. When full strength mix is flowing from the

door spout, raise the draw handle.

Note: Use only fresh mix when priming the freezing

cylinder.

Figure 31

Step 2

Once a steady stream of mix starts to flow from the

prime plug opening in the bottom of the freezer door,

push down the prime plug.

Figure 32

Step 3

Lubricate the o-rings on the air tube on the end with the

small hole on the side.
Step 4

Install the air tube (the end with the hole) with the air

orifice installed into the mix inlet hole in the mix hopper.
Step 5

Press the AUTO key. The AUTO light will come on

indicating the main refrigeration system is operating.

When the unit cycles off, the product will be at serving

viscosity.
Note: On Models 751, 754, 774, and 794 the MIX

REF light will come on, indicating the mix refrigeration

system is operating to maintain the mix in the mix

hopper.

Figure 33

Step 6

Fill the hopper with mix. As the mix level comes in

contact with the mix level sensing probe on the rear

wall of the hopper, the MIX LOW light will shut off.

This manual is related to the following products: