beautypg.com

Connecting to the network, 1 power-up led sequence, Chapter 2 – Cabletron Systems 3H02-04 User Manual

Page 17: Power-up led sequence -1, Chapter 2 connecting to the network

background image

FE Switch Module User Guide

Page 2-1

CHAPTER 2

CONNECTING TO THE NETWORK

This chapter provides reference material and instructions that network
administrators can use to configure the Fast Ethernet Switch Modules.

For instructions on adding a switch module to the ATX, see Chapter 5,

Adding/Swapping Modules

.

2.1 POWER-UP LED SEQUENCE

Watch the LED sequence during power-up. It takes about 1 minute for the
ATX to complete the power-up diagnostics. The ATX begins system
diagnostics on the PPE (topmost module) and then individually on each
installed module, starting at the top and working down to the bottom.

Using both processors, the specific power-up tests run on the switch
module are:

ROM checksum test

Instruction memory test

Memory map tests

Interrupt tests

Fast Ethernet data loopback tests

The power-up LED sequence for the Fast Ethernet module is as follows:

1. All LEDs flash.

2. The PWR LED remains on, and the TX LEDs flash.

3. On each switch module, the following occurs:

a.

The PROC LED comes on for 5 seconds, blinks, then remains lit.

b. The RX and TX LEDs flash momentarily.

This manual is related to the following products: