Hedv sequence of opera tion, Page 13 – Louisville Tin and Stove HEDV254A User Manual
Page 13
![background image](/manuals/62337/13/background.png)
Page 13
Pressure switch
closes proving
inducer
Heater
in
stand-
by
Thermostat
calls for
heat
Power
on to
draft
inducer
Pressure
switch
closes
inducer
proved
Spark
ignition
ener
gized
Gas
valve
opens
gas
flow to
burner
Burner
flame
proved
Blower
on
Heat
cycle
Thermostat
satisfied
Gas
valve
closes
gas flow
to burners
of
f
Draft
inducer
of
f
Blower
of
f
Heater
in
stand-
by
Inducer
continues to
run
One Hour
Lock Out
15 Sec.
inter
purg
e
3
Attempts
for ignition
30 Sec.
180 Sec.
90 Sec.
4 Sec.
NO
NO
YES
YES
NO
NO
YES
YES
STEP #
1)
Thermostat calls for heat.
2)
Draft Inducer turns on.
3)
Pressure switch closes.
4)
Spark ignition begins.
5)
Gas flow to burner
.
6)
Burner ignition proven.
7)
Circulating Blower on.
8)
Heater burns through heating cycle.
9)
Thermostat satisfied.
10)
Gas flow of
f to burner
.
1
1
)
Draft inducer of
f.
12)
Circulating Blowers of
f.
13)
Heater in stand-by
.
NOTE: IF
THERE IS
A
MALFUNCTION IN STEPS 3, 5, 6
THE OPERA
TION SEQUENCE
WILL
ST
O
P
A
T
THA
T
POINT
. FOR STEPS 5 OR 6, IF
AFTER 2
ADDITIONAL
A
TTEMPTS MALFUNCTION STILL
OCCURS,
THE
CONTROL
WILL
LOCK OUT
FOR ONE HOUR. FOR PURPOSE OF
TESTING
,
THE ONE HOUR LOCKOUT
CAN
BE OVERRIDDEN BY
RESETTING
THE
THERMOST
A
T
OR INTERRUPTING
THE ELECTRICAL
POWER.
HEDV
SEQUENCE OF OPERA
TION