beautypg.com

Pre-upgrade steps – Dell Powervault DL2300 User Manual

Page 5

background image

Upgrading from Windows Server 2008 x64 to Windows Server 2008 R2 for

CommVault™ Simpana™

Page 3

Figure 1: AutoProvisioning error with Simpana versions prior to 9.0 on DL2200

Pre-Upgrade Steps

The following section lists the steps that you need to complete prior to initiating the upgrade of the
operating system:

1. Pause the job queue by right clicking on the CommCell and selecting Properties.

2. Navigate to the Activity Control tab and uncheck Enable All Job Activity (CV).

This manual is related to the following products: