beautypg.com

Installation to a high ceiling, Preparation, Make a hole in the ceiling – Canon RS-CL07 User Manual

Page 21: Secure the ceiling-mount bracket to the ceiling, Attach the base bracket to the projector, Attach the anti-fall wires

background image

Mounting hole position

Distance from ceiling to lens axis (l)

RS-CL08

RS-CL09

a

60 cm/2.0'

80 cm/2.6'

b

65 cm/2.1'

85 cm/2.8'

c

70 cm/2.3'

90 cm/3.0'

d

75 cm/2.5'

95 cm/3.1'

e

80 cm/2.6'*

100 cm/3.3'

f

105 cm/3.4'

g

110 cm/3.6'

h

115 cm/3.8'

i

120 cm/3.9'*

Preparation:

Adjust the pipe length according to

the ceiling height

1 Remove the covers of outer and inner

pipes by slightly sliding them and lift up

as shown.

2 Remove four M5 screws from the

sides of the outer pipe, adjust the inner

pipe length according to the projector

installation height, and then secure the

four M5 screws.

● When attaching screws in step 2, insert the

screws and leave an unused screw hole

between them. When the extension pipe is

stretched to its maximum length, insert the

screws in two adjacent screw holes.

Installation to a High Ceiling

Use optional extension pipe RS-CL08 or RS-CL09 for high ceiling.

1

2

Pipe extension length

f

a

b

c
e

g

d

h

l

* To use the extension pipe with it extended to the maximum length, secure it by inserting

screws in the two adjacent screw holes.

l' = 4.1 cm/0.14' (WUX10 MarkII/SX7 MarkII/SX60/X700) /4.5 cm/0.15' (SX80 MarkII/SX800)

i

l'

1

Separate the Joint fitting from the

Ceiling-mount bracket temporarily

Preparation on page 5

2

Make a hole in the ceiling

Step 1 on page 5

3

Secure the Ceiling-mount bracket to

the ceiling

Step 2 on page 5

4

Attach the Base bracket to the

projector

Step 3 on page 5

5

Attach the anti-fall wires

Step 4 on page 6

This manual is related to the following products: