beautypg.com

Transporting, Warning – Great Plains NTA1300 Operator Manual User Manual

Page 18

background image

16

NTA 1000 and NTA 1300 148-528M

5/26/2006

Great Plains Mfg., Inc.

Operating Instructions

Figure 12

Lock Pin Installed

Figure 13

Pivot Lock Tubes Secured

Transporting

!

WARNING!

Towing the implement at high speeds or with a vehicle that is
not heavy enough can lead to loss of vehicle control. Loss of ve-
hicle control can lead to serious road accidents, injury and
death. To reduce the hazard:

Do not exceed 25kph (15 mph).
Do not tow an implement that, when fully loaded, weighs

more than 1.5 times the weight of the towing vehicle.

1.

Check that implement is securely hitched to a suffi-
cient tractor. Refer to Hitching Tractor to Implement,
Preparation and Setup,” Page 9. Make sure safety
chain is secured to tractor.

2.

Unload seed box before transporting if at all possible.
The implement can be transported with a full box of
grain, but added weight will increase stopping dis-
tance and decrease maneuverability.

3.

Check that tires are properly inflated. Refer to Tire In-
flation Chart
, “Appendix,” page 36.

4.

Know implement dimensions in transport position.
Choose a route that provides adequate clearance
from all obstructions. Refer to “Specifications and
Capacities
,” page 35, for dimensions.

5.

Hydraulically lift drill with transport-lift cylinders.

Refer to Figure 12

6.

Install transport lock pins in vertical axle tubes.

Refer to Figure 13

7.

Secure pivot-lock tubes for transport. Position tubes
so they are horizontal against hitch frame.

Refer to Figure 14

8.

Install lock channel over extended tongue-cylinder
rod.

9.

Plug light-harness lead into tractor connector. Always
use warning lights when transporting drill.

Comply with all laws when travelling on public roads.

Figure 14

Lock Chanel Iistalled

10555

17208

17217

This manual is related to the following products: