beautypg.com

Great Plains CF600 Predelivery Manual User Manual

Page 15

background image

13

Section 2 Preparation and Setup

2/2/06

CF500 and CF600 Hydraulic Cross-Fold Boom 506-582Q

Great Plains Mfg., Inc.

Figure 2-14

Dry Boom Nozzles, Center Section

Figure 2-15

Dry Boom Nozzles, Inner Arm

Figure 2-16

Dry Boom Nozzles, Outer Arm

16940

16996

16995

The illustrations on this
page are an example of
where to place end noz-
zles, tee-nozzles and tee-
fittings. Placement will de-
pend on nozzle spacing.

When mounting nozzles
on the left-hand, inner arm,
mount nozzles on the in-
side of the arm as shown in
Figure 2-15. Mount all oth-
er nozzles to the rear.

4.

Plumb nozzles. From the
roll of 3/4-inch hose, cut
lengths to connect noz-
zles. Use worm clamps to
secure hoses to nozzles.

The illustrations on this
page are an example of
where to place tee-fittings
(1) for supply lines. Your
goal is to have a tee-fitting
for each wing and center
section so each boom sec-
tion can have its own sup-
ply line. Use zip ties (2) to
secure hoses.

This manual is related to the following products: