Wide center frame assembly – Great Plains 7336 DH Predelivery Manual User Manual
Page 12

8
Series II Disk Harrow
Great Plains Manufacturing, Inc.
556-235Q
2014-06-25
Wide Center Frame Assembly
Refer to Figure 5
6.
Lower the left
and right
sides of the center
frame onto stands
.
7.
Install the
3
⁄
4
” x 2” Gr. 8 hex bolts
through the 4-
hole tie plates
, secure with
3
⁄
4
” lock washers and
3
⁄
4
” nuts. Do not tighten at this time.
8.
Pin the torque tube weldment to the center frames
with 1
1
⁄
4
” x 9” pins
(outer) and 1
1
⁄
4
” x 7” pins
(center). Secure pins with
1
⁄
2
” x 2
5
⁄
8
” Gr. 8 special
thread bolts
and
1
⁄
2
” top lock nuts.
9.
Remove
1
⁄
2
” x 4
1
⁄
2
” Gr. 5 hex bolt
from the walk-
ing beams. Slide the hub/spindle assembly into the
walking beam and reinstall the hex bolt and secure
with
1
⁄
2
” lock nut.
Note: The center uses 380/55R 16.5 tires while the
wings have 12.5Lx15 tires.
10. Install tire/wheel
to hub assembly
with
5
⁄
8
” lug
nuts
.
11. Fasten center lift cylinders
, base end to center
frame and rod end to torque tube with pins, machine
washers and cotter pins, provided. Be sure the
washer is installed between the cotter pin and the
cylinder.
12. Tighten all bolts to specs, See “Torque Values
12
13
15
14
16
17
18
19
20
21
22
23
11
12
13
14
15
16
17
18
21
19
20
22
14
23
U
D
F
B
L
R
Figure 5
Wide Center Frame
43448