beautypg.com

Furrow checking rate – Great Plains YP2425A Material Rate User Manual

Page 33

background image

Great Plains Manufacturing, Inc.

Table of Contents Metric Charts

Volumetric Seeding

31

2012-02-29

Table of Contents Metric Charts

401-626B

Furrow Checking Rate

a. Configure the planter for the approximate rate, based

on the charts.

b. Set the meter pressure to the chart value.

c. Prime the meters. See your planter Operator manual

for the steps.

d. Plant for a short distance, just until the air delivery

system is stabilized, and the meters are all delivering
seed.

e. Select one or more rows to sample.

f. Set the planting depth to shallow for the sample

row(s). Set the press wheels to minimum force. Use a
wire to tie up the press wheel assembly.

g. Resume planting for a short distance.

h. Use a sampled row length

a

of one foot.

Count the seeds.

i.

Find the nearest “Seeds per Row Foot” in the table for
your row spacing.

j.

Look up the Population, or “Pounds per acre”.

a. You can interpolate rows for more precise rate results. Doubling or tripling the sample length improves accuracy.

Row Spacing

Seeds per

Population

Pounds per acre

Inches

Row Foot

Seeds/Acre

at 12500 s/lb

at 15000 s/lb

at 17500 s/lb

9.5in Rows

45

2 500 000

200

167

143

41

2 250 000

180

150

129

36

2 000 000

160

133

114

32

1 750 000

140

117

100

27

1 500 000

120

100

86

23

1 250 000

100

83

71

18

1 000 000

80

67

57

14

750 000

60

50

43

10in Rows

48

2 500 000

200

167

143

43

2 250 000

180

150

129

38

2 000 000

160

133

114

33

1 750 000

140

117

100

29

1 500 000

120

100

86

24

1 250 000

100

83

71

19

1 000 000

80

67

57

14

750 000

60

50

43

One Row of Twin Row 30in

72

2 500 000

200

167

143

or

65

2 250 000

180

150

129

15in Rows

57

2 000 000

160

133

114

50

1 750 000

140

117

100

43

1 500 000

120

100

86

36

1 250 000

100

83

71

29

1 000 000

80

67

57

22

750 000

60

50

43

32325A