beautypg.com

Assembly, Tools required, Pre-assembly checklist – Great Plains 3S-4000F Predelivery Manual User Manual

Page 8

background image

3S-4000

195-242Q

9/12/2009

6

The following headings are step-by-step instruc-
tions for assembling the 4000-3S drill. Begin with
“Tools Required” and “Pre-Assembly Checklist” to
make sure you have all necessary parts and
equipment. Follow each step to make the job as
quick and safe as possible and produce a properly
working machine.

The 4000-3S drill is shipped via flat bed truck. It is
the dealer’s responsibility to unload the new ma-
chine. Unload all equipment before beginning
assembly. Do not attempt any assembly work
while the 4000-3S drill is on the truck.

Tools Required

Fork lift, overhead hoist, or loader

General hand tools

Pre-Assembly Checklist

1.

Before assembling, read and understand “Im-
portant Safety Information,” beginning on
page 1.

2.

Have at least two people on hand while as-
sembling.

3.

Make sure assembly area is level and free of
obstructions (preferably an open concrete ar-
ea).

4.

Have all major components.

5.

Have all fasteners and pins shipped with the
drill.

IMPORTANT: If a pre-assembled part or fas-
tener is temporarily removed, remember
where it goes. Keep the parts separated.

6.

Have a copy of the parts manual on hand. If
unsure of proper placement or use of any part
or fastener, refer to the parts manual.

Assembly

This manual is related to the following products: