beautypg.com

Optional ceramic refractory installation, Optional screen kit installation, Optional remote control – Vermont Casting BHDR36 User Manual

Page 36

background image

- 36 -

OPTIONAL CERAMIC REFRACTORY

INSTALLATION

6. Hang Bay Window Frame assembly over existing glass

frame.

Do not remove existing glass frame

7. Re-install top louvre assembly.

Remove all plastic from brass trims

8. Open the Bottom Bay Louvre door and screw two (2) self

tapping screws (as per step 1 above) to the bottom of the
unit where the hinges were

9. Bottom brass trim is removable when unit is installed with

marble or tile surround which cover the fireplace bottom.

Fig. 76

CERAMIC REFRACTORY

CERAMIC REFRACTORY

BOTTOM BAY LOUVRE

SCREWS

BAY WINDOW FRAME

BOTTOM

BRASS

TOP LOUVRE

SPACERS

OPTIONAL SCREEN KIT INSTALLATION

To install the Frame Window Screen:

WARNING:

DO NOT install the frame

window screen with the fireplace ON

1- Slide the top edge of the frame window screen
through the slots beneath the main frame window
top trim support.
2- Make the frame window screen parallel to the main
frame window.
3- Slide the bottom edge of the frame window screen
into the space that exist between the glass and the
main frame window bottom trim support.

WARNING: If the fireplace is ON, turn it
OFF and wait until the temperature of the
window screen is cool enough to handle.

To remove the Frame Window Screen:

1- Lift the frame window screen moving it parallel to the
glass.
2- Move the bottom side of the frame window screen
away from the glass.
3- Slide the frame window screen down from the top trim
support.

TOP TRIM
SUPPORT

BOTTOM TRIM SUPPORT

MAIN

FRAME

Fig. 77

1.

Remove glass and logs.

2.

Place refractory side supports so that the hole fits over
the screw head on the firebox floor.

3.

Place refractory base sides on the floor of the firebox.

4.

Place back refractory - small brick edge down into
support (See Fig. 79).

5.

Attach adjustable tabs, packed with refractory, onto
the studs found on the top of the firebox using the 2-10/
24 nuts provided.

6.

Slide side panels into side supports and behind side
tab and adjust, fitting the ceramic tight to the side of the
firebox. Tighten nuts. Fig. 78.

Mortar lines must be lined up.

Fig. 78

Fig. 79

SIDE

PANEL

SIDE

PANEL

BASE SIDE SUPPORTS

BURNER TRAY

LOG SUPPORT

BACK PANEL

SIDE

TAB

SIDE

TAB

BASE SIDE

REFRACTORY

BASE SIDE

REFRACTORY

FIREBOX

BACK

REAR LOG

SUPPORT

REFRACTORY

BACK PANEL

7.

Place refractory base centre in front of the burner.

OPTIONAL REMOTE CONTROL

MRC1 - On/Off Button Remote Control

MRC2 - Temperature Control Remote

MRC3 - Temperature Control w/digital display &

24 hour programmable clock

IMT

- Wall Mounted Thermostat Control