2installation – Trebor 20 PURUS User Manual
Page 4

PAGE 4
P20 PUMP OPERATION / MAINTENANCE MANUAL
2
INSTALLATION
2.1 UNPACKING
After unpacking, the pump should be checked for any damage that may have occurred
during shipment. Damage should be reported to the carrier immediately.
NOTE: Although extensive efforts are made to deliver pumps to our customers completely
dry, new pumps may contain residual moisture from their final DI water test.
The following items should be included within the shipping container:
Qty
Item
Description
1
1
1
PURUS 20
MP20
PC7
Purus 20 Pump
Manual, Purus 20 pump
PC& Pump Controller (optional)
2.2 UTILITIES / HOOK-UP
The pump is mounted using four ¼
” (6mm) bolts. It is recommended that the pump be
positioned within 15° from level to maintain self-priming ability and pumping efficiency.
Allow sufficient room for tubing connectors.
Figure 2-1: Dimensions (with mounted PC7 option & flare connection)